Koskela frames construction as a production system
Labels: Lauri Koskela, CIFE, Production SystemLauri Koskela’s CIFE Technical Report #72 argued that construction should be managed as a production system, not just as separate tasks and contracts. This reframing helped set the intellectual foundation for “lean construction,” including later work on planning reliability and workflow.