Early setup-reduction insights from Toyo Kogyo
Labels: Toyo KogyoIn the early period of Shingo’s setup-reduction thinking, he observed how much time was lost during equipment changeovers and preparations. These early observations helped shape the core idea that some setup work can be prepared before a machine stops, instead of during downtime. This became a key building block for later SMED methods.